Oil and water tanks installed on slab.Shoveling the concrete to level the slab.Concrete truck ready to send it.Concrete on its way to the basement.Boiler tied in to pumps and water feed.Biasi boiler in basementHot water runs to manifold location and oil tank in basement
Electrical and Plumbing
Electrical service, transfer panel and DSL feed installed.Electrical panel reinstalled and awaiting connectionSecond floor bathroom washer/dryer and toilet rough in.The last plumbing obstacle, burying the shower trap in the joist bay.HG Reed on site to do electrical and heating layout.Drains and vents rough in done and waiting for inspection.Basement drain that will replace sump pump.Start of rough in plumbingStart of rough in plumbing(2)New main panel loctionHot water lines to second floor
Reconstruction
Deck, stairs and railings complete.Bulkhead doors installed.New bulkhead doors being built.Water facing, back of house siding complete.North siding complete, back siding in progress.South siding complete.Front siding coming off for replacement.Deck framing finishing(1)Deck framing finishing(2)Concrete pouring for deck posts..Deck foundation tubes ready for concreteSiding finishing up on south wall.Siding going up on south wall.Siding removed and quarter round windows installed in 2nd floor bathroomNew window for kitchenFirst floor bathroom windowSlider door...in partsNew windows for east wall installedView out new window from first floorView out master bedroomChimney boxed on second floorHallway: Bathroom on left, Master in frontHallway: Guest BedroomBrickwork on chimney finishing, rebuilt to look like original chimneySecond floor, looking at framing for bathroomBack (seaward) wall showing framing for slider (left) and 8' picture windowLooking across back wall from kitchen areaEntry and staircase opened up two storiesElectrical panel moved to front entryNew floor on first floor, stone and plastic liner belowNew floor on first floorAnother view of new chimney going upView of new chimney going upSecond floor dormer, windowsSecond floor dormer